Lochsa Engineering provided the structural engineering for this new single-story expansion to the existing high school campus.  Due to budgeting concerns, Lochsa Engineering helped develop cost effective structural engineering alternatives while working with the architect to achieve the desired appearance and functionality.  Additional concerns that had to be addressed were a limited time frame to complete the work so that the building could be occupied before the next school year.  After balancing the various demands, Lochsa Engineering developed a steel-masonry system that provided the required durability while meeting the limited construction schedule.

Project Information
Market Sector: 
Location: 
Area Size: 
16,600 sq ft
End Date: 
April, 2013
Services Performed
Structural: 
Featured Service: