Parking Structure

Boise State University Lincoln Parking Garage

This post-tension concrete parking garage on Boise State University’s campus is five levels, 720 spaces and 225,540 SF. This is an addition to an existing parking structure, thus requiring addtional coordination between disciplines.

Terrible Herbst Parking Garage

Lochsa Engineering provided structural engineering services for this pre-cast concrete structure with cast-in-place shear walls. This five story structure was designed for two additional stories of future parking. Over 600 parking spaces are located in the 240,000 SF space.
 

Sky Las Vegas

Located along famous Las Vegas Boulevard, the distinctive appearance of this 45-story, 500-foot tall residential tower is highlighted by its unique blue glass exterior and white horizontal EIFS bands.  The 405 suites ranging from 1,179 to 2,000 square feet are complimented by an integrated low rise podium that features a 700-car parking structure, three swimming pools, and over 40,000 square fe

Panorama Tower Garages

This project includes parking garages correlating with the three tower high-rise residential development overlooking the world famous Las Vegas Strip.  The construction featured two 33-story luxury towers with complementary parking and amenity facilities integrated into the low-rise podium structure.  Each 660,000 square foot tower stands 403-feet above Dean Martin Drive and offers 323 resident

Palms Place

Lochsa Engineering provided civil and structural engineering design and construction services for a 47-story luxury high-rise condominium tower and spa.  The 599 condominium suite structure features a 5-story podium below the tower consisting of two parking levels with 262 stalls, a valet area, office space, meeting rooms and a 50,000 square foot pool and spa on the 5th level, all integrated wi

Hard Rock Las Vegas South Garage

Lochsa Engineering provided structural engineering design and construction services for the recent Hard Rock Hotel and Casino expansion in Las Vegas.  The expansion included a new tower with 350 new guestrooms, the addition of more than two acres to the already famed Beach Club and Pool, a luxurious Spa facility, expanded Sports Book, a brand new Hard Rock Hotel Merchandise Store, four new rest

Hard Rock Las Vegas North Garage

Lochsa Engineering provided structural engineering design and construction services for the Hard Rock Hotel and Casino North Garage in Las Vegas.  This eight-story garage was designed as a concrete moment frame structure with concrete columns and 5-inch thick concrete post-tensioned slabs.  The corner of the garage extended over an existing 64’-0” wide box culvert.  Special consideration and de

Fontainebleau Resorts

With limited site and schedule constraints, this 2.8 million square foot, multi-use facility provided many challenges and many more opportunities for creative, collaborative solutions by members of the design-build team.  A unique combination of precast concrete and structural steel framing produced an economic design solution that could be erected quickly with a minimal construction lay down a

City of Henderson City Hall Complex

Lochsa Engineering provided complete structural engineering design for this $39.5 million expansion, which quadrupled the size of Henderson City Hall, increasing from 56,500 square feet to 283,000 square feet was completed in September 2004. The revitalization of this complex includes an amphitheater, the restoration of a 14-year old city hall and renovation of the civil plaza.

Cannery Hotel & Casino Parking Garage

The 1.2 million square foot development, located near the intersection of Craig Road and Interstate 15, is designed to look like an old-fashioned 1940’s cannery in appearance and theme.  The Cannery Casino & Hotel has been a multi-phase development spanning the past 9 years.  Design started on the original portion of the Casino/Hotel in 2001.  Construction started in 2002 and the facility o

Subscribe to Parking Structure