Other

Wyndham Desert Blue

Lochsa Surveying provided the survey for civil design and installation of an electric transmission main line. Provided alignment/right-of-way study in order to resolve the limits of public road and topographic survey of existing surface features and subsurface utility elevations as possible for the placement of the proposed electric transmission main feed to the new resort.

SNWA Lower Narros and Homestead Weirs

One-mile of regrade, realign, place rip rap and construction of weirs in a portion of the Las Vegas Wash.

Sands Exposition Center Expansion Nevada Power Corridor Study

Corridor study for the possible extension of electrical transmission facilities.  Provided alignment/right-of-way study in order to resolve the limits of public road and topographic survey of existing surface features and subsurface utility elevations as possible for the placement and design of the proposed electric transmission main fee to the new resort.

 

 

Horse Road and US 95 Interchange

Working directly for the general contractor, Lochsa Surveying is providing all of the survey construction control staking for a 230-foot long by 200-foot wide “x” style concrete bridge interchange including 14 support columns, girders, wing walls, 300-foot long concrete abutments, post tensioned concrete surfaces, camber considerations, retaining walls, mass grading and 4 on/off ramps onto the

Fontainebleau Offsite Electrical Corridor

Two thousand feet of electrical transmission main off-site through Circus Circus property. Lochsa Surveying provided alignment/boundary/topographic survey for the design and placement of electrical facilities together with pothole identification survey of existing underground utilities.

CCWRD Manhole & Pipe Rehabilitation #643

Lochsa Surveying was contracted to provide staking and as-built services for this rehabilitation. Part of the as-built services included monitoring any movement around the excavation where trenches remained open for many weeks to complete the work.

Clark County Shooting Park

Over 4 kilometers of new high pressure 12” ductile iron pipe, a pump station and two-7,600 cubic meter water storage reservoir steel tanks.

Subscribe to Other