The project occupies a former parking lot.  Demolition plans were prepare to remove existing facilities and relocate existing infrastructure.  Detailed Civil design included grading the project site to match into all four sides of existing development and to channel stormwater into planter areas to be harvested for irrigation.  Coordinated the site credits for LEED certification.  Infrastructure design included the relocation of school utilities and installation of a new chiller plant complex.  Survey performed both the existing survey/topo and construction services.  Construction scheduling and staging had to work around the school schedule.

 

Project Information
Market Sector: 
Area Size: 
120,000 SF
Cost: 
$88 Million
End Date: 
January, 2008