Main menu

Infrastructure

Rock Creek Dairy Digesters

This Design/Build project consists of six, one million gallon reinforced concrete digester tanks and measures at 86’ diameters by 26’ high. Also included in this project is a 6,150 SF generator housing structure, in addition to a 8,400 SF solids handling building and reception tanks.

Bridger Coal Mine

Lochsa Engineering assisted in the construction administration services for the Bridger Coal Mine expansion. Bridger Coal Co. has gradually expanded its 36 year-old Sweetwater County mine to include underground operations, in addition to its surface mines, making it the county’s largest coal operation.

Greenleaf Wastewater Treatment Plant

Lochsa Engineering provided architectural and structural services for this new wastewater treatment facility in Greenleaf, Idaho. Currently all building structures in the City of Greenleaf are connected to septic tanks and drain fields, which potentially could contaminate groundwater contamination.

Subscribe to Infrastructure