This post-tension concrete parking garage on Boise State University’s campus is five levels, 720 spaces and 225,540 SF. This is an addition to an existing parking structure, thus requiring addtional coordination between disciplines. This project was designed in REVIT for better access to structural engineering design.

Construction began in the spring of 2010 and completed in August of 2011, before the students’ return to campus. Lochsa Engineering provided all the REVIT design services for this project in addition to being Engineer of Record.

Completed: 2011

Services: Structural, BIM